Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1908.6
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Apr 29, 2024     Brake Line Brackets, Firewall Holes - (4.5 hours)       Category: Fuselage
Remade larger version of one of the parts of the firewall brake mount using a thinner material. After fitting, made the center spacer. Clamped all the parts together and drilled. Trimmed all the edges to match. Installed the completed bracket.

Considered different options for the brake line mount on the center rudder bar support. Mocked up several potential mounts with pasteboard.

Discussed the two options for location of the firewall feedthrough for GEA 24 signals with Ellicia. Looked at pictures from a project that Deene was supporting. Decided to use a third location that offers several benefits including more room to route wires, lower overall wire length and more clearance above the battery to allow easier replacement.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.